Sampling and Product Development
Product development can begin from drawings, reference images, a physical sample or a written specification. The more complete the information, the more efficiently our team can evaluate the project.

Sample Development
We review the style, material, construction, size range, colors, trims, branding and packaging requirements before sampling. A typical sample lead time is 7–10 working days, depending on complexity and material availability.

Sample Review
After receiving the sample, review fit, measurements, appearance, workmanship and branding details. Consolidated feedback helps move revisions forward efficiently.

Prepare for Bulk Production
Bulk production begins after the product details, sample, commercial terms and production plan are confirmed. Typical production time is 25–40 days, subject to the final order.
Requirements
Share reference images, drawings or samples and your product specifications.
Sampling
Review construction, materials, fit, colors and brand details.
Production
Confirm the sample and production plan before bulk manufacturing.
Inspection & Packing
Check workmanship, measurements, appearance and packing against the approved specification.
Discuss Your Lingerie Project
Share your target styles, quantity, size range and branding requirements.